Steel portal frames

Yennora Logistics Hub

2022-06-24T20:21:35+10:00

https://youtu.be/tsComPvgS48 Prime Constructions have delivered the overall logistics centre which includes Buildings 1, 1A and 1B. The project was challenged by softer ground conditions on the site which required bored piers on which steel portal frames we reerected. Precast concrete dado panels were then installed after which metal roofing and wall cladding was installed. Once [...]