Yennora NSW

Commercial, Industrial

Structural Engineers: Griffith Engineers Australia

Area

60,000 m2

client

Fife Capital

Builder

Prime Constructions

Architect

Consultant

Complete

2020

Read the full project details below and remember to follow the Griffith Engineers Australia YouTube Channel for our latest project videos.

https://youtu.be/tsComPvgS48

 

Prime Constructions have delivered the overall logistics centre which includes Buildings 1, 1A and 1B. The project was challenged by softer ground conditions on the site which required bored piers on which steel portal frames we re-erected. Precast concrete dado panels were then installed after which metal roofing and wall cladding was installed. Once the envelope of the building was closed, the internal fibre concrete slabs were poured. The main offices are constructed using a tilt up construction method. As the capacity of the existing stormwater drainage system is limited, a 3,000,000-litre on-site stormwater detention (OSD) system has been incorporated in the design to reduce the impact on the adjacent creek. The OSD tank has been constructed to manage the stormwater for all three warehouses totalling a little over 60,000m2.The tank has a storage capacity of 3.5m litres and feeds into two Gross Pollutant Traps (GPT) which ensure the water is cleaned before being discharged into the adjacent council stormwater channel.

 

Achievements:

 

  • Large on-site stormwater detention tanks
  • Design of 4 Buildings

 

 

 

Fife Yennora

Tags: Dado panels, GPT, Gross Pollutant Traps, on-site stormwater detention, OSD, Precast concrete, Steel portal frames, Stormwater, Warehouses

Like what you see?
Partner with us on your next project.

Related Projects

Offering quality structural engineering consulting since 1973. Explore more of what Griffith Engineers Australia can do for you.